Official data · U.S. Energy Information Administration, Form EIA-861 · 2024 data · Synced

Fort Pierce Utilities Authority · Florida

Municipal utility · EIA utility no. 6616 · 24,444 residential customers reported

In 2024, Fort Pierce Utilities Authority's Florida customers averaged 0.9 outages and 45 minutes without power, and paid about $110 a month for electricity (12.6¢/kWh). These are Fort Pierce Utilities Authority's own filings to EIA, under the Other reliability standard, including major storm days.

Outages / yr (SAIFI)
0.9
Time out / yr (SAIDI)
45 min
Avg residential bill / mo
$110
Price / kWh
12.6 ¢

Outage history

Minutes without power per customer · storm days shown separately
Fort Pierce Utilities Authority annual outage history in Florida: minutes without power per customer with and without major storm days, and outages per year, by year, from EIA.
Year With storm days Without storm days Outages / yr Relative duration
2024 45 45 0.9
2023 66 66 0.9
2022 76 76 1.2
2021 67 67 1.1
2020 47 47 1.4
2019 56 56 1.0
2018 35 35 0.8
2017 3,323 75 2.9
2016 86 n/r 2.4
2015 41 n/r 0.5
Storm-heavy years look worse with major storm days included; with them removed, the underlying year is comparable. We always show both so a single storm season is not mistaken for a trend. What is a Major Event Day?

About these numbers

Source
U.S. Energy Information Administration, Annual Electric Power Industry Report (Form EIA-861), 2024 data. The monthly bill and price per kWh are computed by CheckedHome from EIA residential revenue and sales. View the source. Synced from EIA on .
Self-reported
Utilities report these figures to EIA themselves; EIA does not audit every submission, and outages from recent months appear only in the next annual release.
Major storm days
Outage figures can be shown with or without Major Event Days (severe storms). We show both on utility pages and never cherry-pick.
A correction?
We republish the official record verbatim. If a figure looks wrong, see Corrections; we re-check it against EIA.
Reporting standard
Fort Pierce Utilities Authority reports under the utility-defined (non-IEEE) method. The standard used is shown so figures are not mixed silently.
Counties served
St Lucie.

We show EIA values as published, reformatting only for a consistent house style. How we display these figures.