Official data · U.S. Energy Information Administration, Form EIA-861 · 2024 data · Synced

Salt River Project · Arizona

Political Subdivision utility · EIA utility no. 16572 · 1,053,407 residential customers reported

In 2024, Salt River Project's Arizona customers averaged 1.0 outages and 58 minutes without power, and paid about $163 a month for electricity (13.5¢/kWh). These are Salt River Project's own filings to EIA, under the IEEE reliability standard, including major storm days.

Outages / yr (SAIFI)
1.0
Time out / yr (SAIDI)
58 min
Avg residential bill / mo
$163
Price / kWh
13.5 ¢

Outage history

Minutes without power per customer · storm days shown separately
Salt River Project annual outage history in Arizona: minutes without power per customer with and without major storm days, and outages per year, by year, from EIA.
Year With storm days Without storm days Outages / yr Relative duration
2024 58 53 1.0
2023 70 49 1.0
2022 81 50 1.1
2021 85 48 1.0
2020 47 41 0.8
2019 49 43 0.8
2018 84 37 0.8
2017 48 38 0.7
2016 46 43 0.7
2015 59 42 0.8
Storm-heavy years look worse with major storm days included; with them removed, the underlying year is comparable. We always show both so a single storm season is not mistaken for a trend. What is a Major Event Day?

About these numbers

Source
U.S. Energy Information Administration, Annual Electric Power Industry Report (Form EIA-861), 2024 data. The monthly bill and price per kWh are computed by CheckedHome from EIA residential revenue and sales. View the source. Synced from EIA on .
Self-reported
Utilities report these figures to EIA themselves; EIA does not audit every submission, and outages from recent months appear only in the next annual release.
Major storm days
Outage figures can be shown with or without Major Event Days (severe storms). We show both on utility pages and never cherry-pick.
A correction?
We republish the official record verbatim. If a figure looks wrong, see Corrections; we re-check it against EIA.
Reporting standard
Salt River Project reports under the IEEE 1366 method. The standard used is shown so figures are not mixed silently.
Counties served
Gila, Maricopa, Pinal.

We show EIA values as published, reformatting only for a consistent house style. How we display these figures.